WORK PLAN
The
time frame allocated for this research study is 6 months. It start in july 2012
and completed in November 2012. The gantt chart for the project and miles stone
are shown as table 1.
In this project, the most
difficulty is to design and test the
circuit because circuit need to be perfectly function. When construct the
circuit will have some problem such as failure of components or module ,
lack of maintenance and system overload. So the knowledge about
the circuit and component should be taken a long period to be done. Other than
that, the difficulty that wills faces is environment factors (such as not
enough photon energy from sunlight, didn’t have wind and etc.).
To solve these kind of problems it should be referred to professional that
familiar with the hybrid energy harvester prototype and also do troubleshoot by
correcting the failure parts or system. This data is then analyzed, with many
simplifying assumption applied. The result will be display by using DAQ and
LABVIEW software.
The
prototype of PV-TE hybrid system will be develop to enables the community to
visualize the impact and application of the proposed methods in determining the
best solution in PV-TE hybrid system design with respect to reliability and
cost. This prototype will be presented in the FYP Presentation Day. we are also
need to take a video as a demonstration when we are try the prototype in case
there are something happens that will influence the process in that day.