Friday, 1 March 2013
Wednesday, 20 February 2013
WEEK 6
Activity:
- Testing the Solar Panel
Objective:
- To make sure this Solar Panel are functioned.
- Measure the output value from the Solar Panel (directly without any circuit). Measure the voltage and current output produced from the Solar Panel using Multimeter.
- Determine the maximum performance using this Solar Panel. To produce the max output, test the Solar Panel at shining day.
The solar Panel will produce the different output power depending on the brightness of the light. For this testing, not use sunlight, but change the sunlight with brightness of the lamp.Solar Panel can be operating when we expose to brightness of the lamp and there will give the electricity output. from this testing we can analyzed that the more brightness apply at the PV, the more output value will be get.
Thursday, 14 February 2013
WEEK 5
Activity:
Activity:
- Testing the Thermoelectric Module
- To make sure this Thermoelectric Module are functioned.
- Measure the output value from the Thermoelectric Module using Multimeter.
- Determine the maximum performance using this Thermoelectric Module. To produce the max output, give the largest different temperature on each side of the Thermoelectric Module.
| 250mV without human temperature |
| 700mV with human temperature |
While measuring the output value produced from the thermoelectric, i'm using ice cube to get 0degree celcius and the temperature of the human body has been used. Voltage that produced are around 250mV - 700mV. Thermoelectric Module can be operating when we supply the power and there will give some different temperature of the each side of that module which means, the grater different temperature apply at the thermometer, the larger output will be produce.
Friday, 8 February 2013
WEEK 4
ACTIVITY:- Project Progress.
- Buy the project materials.
OBJECTIVE:
- Buy the solar panel.
- Buy thermoelectric module.
For this week progress, the solar panel and thermoelectric module have been purchased at Jalan Pasar. Measuring equipment and tools also have been purchased.
The specification for this solar panel is:
- Max output power: 5W
- Vmp: 16.8V
- Imp: 0.3A
- Voc: 21V
- Isc: 0.38A
- Dimension: 254 x 294 x 25
| Photovoltaic |
| Thermoelectric |
Friday, 1 February 2013
WEEK 3
Activity:
- Project Progress.
- Buy the component for two supply controller.

PRINT BOARD CIRCUIT

H-BRIDGE COMPONENT AND CAPACITOR
Objective:
- Design circuit in the bread board.
- Testing the circuit using the bread board.
This week there have showed some progress which The two supply controller circuit have been designed. Using the bread board, the simple circuit have been designed. For the next week progress, maybe the solar panel should be purchased at the market and the circuit will be tested with the solar panel.
Activity:
- Project Progress.
- Buy the component for two supply controller.
| PRINT BOARD CIRCUIT |
| H-BRIDGE COMPONENT AND CAPACITOR |
Objective:
- Design circuit in the bread board.
- Testing the circuit using the bread board.
This week there have showed some progress which The two supply controller circuit have been designed. Using the bread board, the simple circuit have been designed. For the next week progress, maybe the solar panel should be purchased at the market and the circuit will be tested with the solar panel.
Friday, 25 January 2013
WEEK 2
ACTIVITY
- Find the hardware and equipment for the project.
OBJECTIVE
- Check and get related tools for the FYP project
- For the component and tools can get at the Jalan Pasar shop.
- Some material need to get at hardware shop for example wire for the lamp.
- Planning the progress of this project carefully to get best product and result
- The FYP progress should contains the step below:
- Idea and project the title.
- Project preparation.
- Concept development and testing.
- Project development and testing.
- Final preparation.
- At the end of next week the equipment and tools have been buy and all the raw materials related to this project also have classified.
Monday, 14 January 2013
WEEK 1
ACTIVITY
- Final Year Project (FYP) Briefing I at TTL2
- Search the component for the project
OBJECTIVE
- To know about the new agenda in FYPII
- Update profile for the website FYP (RPS).
- student need to update the blog at RPS website
- change or put the latest contact number.
- Search the need component for project from internet.
- this project need to order photovoltaic and thermoelectric
- thermoelectric has been order in 4 pieces.
Subscribe to: